Tildelt2026-110607· Sendt til TED
Konsept, design og ombygging av High Voltage Generator (HOG)
Beskrivelse fra kunngjøringen
Bane NOR and Trafikverket have procured a number of rotating 10 MVA converters from DB. These machines are originally designed with an output voltage on the generator side of 5100V. To achieve the desired voltage of 16.5 kV in the rail network, the voltage from the original converter machines must be transformed up via a 1-phase transformer. The purpose of this project is to rebuild the stator of the converter, so that 16.5 kV can be achieved directly without the additional 1-phase transformer.
Kontraktsdetaljer
Konsept, design og ombygging av High Voltage Generator (HOG)3 tilbud
- VinnerIKM Gruppen AS· bruker underleverandører27,00 mill kr · kontrakt 3.6.2026
Parter
Kjøper
- Bane NOR SF917082308
Vinner
- IKM Gruppen AS912605302
Rådgivere og øvrige parter
- Oslo tingrett926725939
API og MCPGET /tenders/2026-110607
API
curl "https://api.sokfirma.no/tenders/2026-110607" \ -H "Authorization: Bearer sk_api_..."
Svar (utdrag)
{
"notice_id": "2026-110607",
"heading": "Konsept, design og ombygging av High Voltage Generator (HOG)",
"notice_status": null,
"publication_date": "2026-06-16",
"deadline": null,
"estimated_value": null,
"parties": [
{ "role": "buyer", "name": "Bane NOR SF", … },
…
],
…
}MCP
get_tender({ "notice_id": "2026-110607" })Spør AI-assistenten
Hvor mange tilbud kom inn på «Konsept, design og ombygging av High Voltage Generator (HOG)»?
Hvem er kjøper i «Konsept, design og ombygging av High Voltage Generator (HOG)», og hva er kontraktens varighet?
Oppsummer anbudet «Konsept, design og ombygging av High Voltage Generator (HOG)»: hva skal kjøpes, og hvilke krav stilles?
Anskaffelseslivsløp
Andre kunngjøringer i samme anskaffelse.
- 5.9.2025ANNOUNCEMENT_OF_COMPETITION → 2025-112758
- 16.6.2026ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT (denne)
Full kunngjøring
Kjøper
Prosedyre
Beskrivelse
Bane NOR and Trafikverket have procured a number of rotating 10 MVA converters from DB. These machines are originally designed with an output voltage on the generator side of 5100V. To achieve the desired voltage of 16.5 kV in the rail network, the voltage from the original converter machines must be transformed up via a 1-phase transformer. The purpose of this project is to rebuild the stator of the converter, so that 16.5 kV can be achieved directly without the additional 1-phase transformer.
Hensikt
Sted for gjennomføring
Generell informasjon
Delkontrakt
Beskrivelse
Bane NOR and Trafikverket have procured a number of rotating 10 MVA converters from DB. These machines are originally designed with an output voltage on the generator side of 5100V. To achieve the desired voltage of 16.5 kV in the rail network, the voltage from the original converter machines must be transformed up via a 1-phase transformer. The purpose of this project is to rebuild the stator of the converter, so that 16.5 kV can be achieved directly without the additional 1-phase transformer.
Hensikt
Sted for gjennomføring
Generell informasjon
Teknikker
Rammeavtale
Informasjon om den dynamiske innkjøpsordningen
Nærmere informasjon, mekling og revisjon
Resultater
Identifikator for resultatpartiLOT-0000
Informasjon om vinnere
Vinner
Informasjon om kontrakt
Statistisk informasjon
Sammendrag av revisjonsforespørslene kjøperen mottok
Mottatte tilbud eller forespørsler om å delta
Type mottatte innleveringerForespørsler om å delta
Type mottatte innleveringerTilbud
Utvalg av tilbud
Virksomheter
Rollene til denne virksomheten
Kunngjøringsinformasjon
Andre anbud fra BANE NOR SF
Jernbanetekniske arbeider Lillehammer Stasjon E1
Anskaffelse - Ultrasonisk kontroll NDT
Geotekniske grunnundersøkelser - Retningsdrift Brynsbakken
290 000 kr
Anskaffelse av KGV og KAV
15,00 mill kr
Kjøp av tunnelkartleggings- og MWD-tolkningsprogram til fellesprosjektet Arna-Stanghelle